Another delay in getting the Point Lepreau Nuclear Generating Station back in service.
It was taken out of service on March 19th because of equipment issues with the fueling machine. As a result the net capacity factor for March is down to 57.78 per cent.
Additional work is required to the heat transport system.
The plant is expected to be back up and running on April 13th.


